Capacity
5.00 MW
Mapped total
Fife · Fife · Scotland · Scotland
Capacity
5.00 MW
Mapped total
Status
Inactive
Current state
Energy source
Solar
Mapped fuel group
Muirmealing Solar Farm is an inactive solar site in Fife · Fife · Scotland · Scotland with 5.00 MW of mapped capacity operated by Muirmealing Solar Ltd (The Abbey Group).