Capacity
18.0 MW
Mapped total
Winchester · Hampshire · South East · England
Capacity
18.0 MW
Mapped total
Status
Pipeline
Current state
Energy source
Solar
Mapped fuel group
New Farm House Locks Farm is an pipeline solar site in Winchester · Hampshire · South East · England with 18.0 MW of mapped capacity operated by Nextpower Spv 12 Limited.