Capacity
0.11 MW
Mapped total
High Peak · Derbyshire · East Midlands · England
Capacity
0.11 MW
Mapped total
Status
Pipeline
Current state
Energy source
Solar
Mapped fuel group
New Mills Leisure Centre, Hyde Bank Road - PV Panels is an pipeline solar site in High Peak · Derbyshire · East Midlands · England with 0.11 MW of mapped capacity operated by High Peak Borough Council.