Capacity
0.69 MW
Mapped total
Babergh · Suffolk · Eastern · England
Capacity
0.69 MW
Mapped total
Status
Pipeline
Current state
Energy source
Solar
Mapped fuel group
Northern Road, Chilton Industrial Estate - Solar Park is an pipeline solar site in Babergh · Suffolk · Eastern · England with 0.69 MW of mapped capacity operated by JCS Hi-Torque Limited.