Capacity
0.23 MW
Mapped total
Tendring · Essex · Eastern · England
Capacity
0.23 MW
Mapped total
Status
Pipeline
Current state
Energy source
Solar
Mapped fuel group
Orchards Holiday Village, Colne Way - Solar Panels is an pipeline solar site in Tendring · Essex · Eastern · England with 0.23 MW of mapped capacity operated by Bourne Leisure Limited.