Capacity
33.0 MW
Mapped total
Doncaster · South Yorkshire · Yorkshire and Humber · England
Capacity
33.0 MW
Mapped total
Status
Pipeline
Current state
Energy source
Solar
Mapped fuel group
Partridge Hill Solar Farm is an pipeline solar site in Doncaster · South Yorkshire · Yorkshire and Humber · England with 33.0 MW of mapped capacity operated by Green Switch Solutions/Belvedere Energy Developments.