Capacity
0.34 MW
Mapped total
High Peak · Derbyshire · East Midlands · England
Capacity
0.34 MW
Mapped total
Status
Pipeline
Current state
Energy source
Solar
Mapped fuel group
Pennine Aggregates, Waterswallows Lane - Solar Panels is an pipeline solar site in High Peak · Derbyshire · East Midlands · England with 0.34 MW of mapped capacity operated by B-Engineering Group.