Capacity
0.66 MW
Mapped total
Highland · Highlands · Scotland · Scotland
Capacity
0.66 MW
Mapped total
Status
Pipeline
Current state
Energy source
Solar
Mapped fuel group
Quarry Brae - Solar PV Panels is an pipeline solar site in Highland · Highlands · Scotland · Scotland with 0.66 MW of mapped capacity operated by Scottish Water National Operations Control Centre.