Capacity
0.25 MW
Mapped total
West Berkshire · Berkshire · South East · England
Capacity
0.25 MW
Mapped total
Status
Pipeline
Current state
Energy source
Solar
Mapped fuel group
Red Shute Mill, Hermitage - Solar Panels is an pipeline solar site in West Berkshire · Berkshire · South East · England with 0.25 MW of mapped capacity operated by Be Ba Energy.