Capacity
25.5 MW
Mapped total
North Yorkshire · North Yorkshire · Yorkshire and Humber · England
Capacity
25.5 MW
Mapped total
Status
Pipeline
Current state
Energy source
Solar
Mapped fuel group
Redmoor Farm is an pipeline solar site in North Yorkshire · North Yorkshire · Yorkshire and Humber · England with 25.5 MW of mapped capacity operated by TGC Renewables.