Capacity
0.52 MW
Mapped total
Great Yarmouth · Norfolk · Eastern · England
Capacity
0.52 MW
Mapped total
Status
Pipeline
Current state
Energy source
Solar
Mapped fuel group
Seashore Holiday Park, North Drive - Solar Panels is an pipeline solar site in Great Yarmouth · Norfolk · Eastern · England with 0.52 MW of mapped capacity operated by Bourne Leisure Limited.