Power siteSolar asset

Snowdown Colliery

Dover · Kent · South East · England

Mapped capacity
5.00 MW
Status
Inactive
Energy source
Solar

Capacity

5.00 MW

Mapped total

Status

Inactive

Current state

Energy source

Solar

Mapped fuel group

Power Source: Solar

Snowdown Colliery is an inactive solar site in Dover · Kent · South East · England with 5.00 MW of mapped capacity operated by BNRG Renewables UK.

Postcode[object Object]
CountyKent
RegionSouth East
CountryEngland

Site facts

Status
Inactive
Energy source
Solar
Mapped capacity
5.00 MW
Operator
BNRG Renewables UK
Commissioned
2016
Address
Former Snowdown Colliery, Dorman Avenue South, Snowdown, Aylesham, Canterbury