Capacity
0.18 MW
Mapped total
South Cambridgeshire · Hertfordshire · Eastern · England
Capacity
0.18 MW
Mapped total
Status
Pipeline
Current state
Energy source
Solar
Mapped fuel group
South Farm, Shingay Cum Wendy - Ground Mounted Solar Array is an pipeline solar site in South Cambridgeshire · Hertfordshire · Eastern · England with 0.18 MW of mapped capacity operated by BeBa Energy UK Limited.