Power siteSolar asset

SPD 3 - Grange Farm

East Midlands · England

Mapped capacity
9.50 MW
Status
Operational
Energy source
Solar

Capacity

9.50 MW

Mapped total

Status

Operational

Current state

Energy source

Solar

Mapped fuel group

Power Source: Solar

SPD 3 - Grange Farm is an operational solar site in East Midlands · England with 9.50 MW of mapped capacity operated by RES Group.

RegionEast Midlands
CountryEngland

Site facts

Status
Operational
Energy source
Solar
Mapped capacity
9.50 MW
Operator
RES Group
Commissioned
2015
Grid connection
LV