Capacity
5.00 MW
Mapped total
North Northamptonshire · Northamptonshire · East Midlands · England
Capacity
5.00 MW
Mapped total
Status
Operational
Current state
Energy source
Solar
Mapped fuel group
Sywell Road is an operational solar site in North Northamptonshire · Northamptonshire · East Midlands · England with 5.00 MW of mapped capacity operated by NESF (formerly Lark Energy).