Capacity
39.3 MW
Mapped total
North Northamptonshire · Northamptonshire · East Midlands · England
Capacity
39.3 MW
Mapped total
Status
Pipeline
Current state
Energy source
Solar
Mapped fuel group
The Grafton Solar Project - Solar Photovoltaic Panels is an pipeline solar site in North Northamptonshire · Northamptonshire · East Midlands · England with 39.3 MW of mapped capacity operated by Stantec.