Capacity
0.57 MW
Mapped total
North East Lincolnshire · Lincolnshire · Yorkshire and Humber · England
Capacity
0.57 MW
Mapped total
Status
Pipeline
Current state
Energy source
Solar
Mapped fuel group
Thorpe Park Holiday Camp, Anthonys Bank Road - Solar Panels is an pipeline solar site in North East Lincolnshire · Lincolnshire · Yorkshire and Humber · England with 0.57 MW of mapped capacity operated by Bourne Leisure Limited.