Capacity
10.0 MW
Mapped total
Dover · Kent · South East · England
Capacity
10.0 MW
Mapped total
Status
Operational
Current state
Energy source
Solar
Mapped fuel group
Tilmanstone Colliery is an operational solar site in Dover · Kent · South East · England with 10.0 MW of mapped capacity operated by Ovenden Plant Hire Limited.