Power siteSolar asset

Tilmanstone Colliery

Dover · Kent · South East · England

Mapped capacity
10.0 MW
Status
Operational
Energy source
Solar

Capacity

10.0 MW

Mapped total

Status

Operational

Current state

Energy source

Solar

Mapped fuel group

Power Source: Solar

Tilmanstone Colliery is an operational solar site in Dover · Kent · South East · England with 10.0 MW of mapped capacity operated by Ovenden Plant Hire Limited.

Postcode[object Object]
CountyKent
RegionSouth East
CountryEngland

Site facts

Status
Operational
Energy source
Solar
Mapped capacity
10.0 MW
Operator
Ovenden Plant Hire Limited
Commissioned
2016
Address
Former Tilmanstone Colliery Tip, Pike Road, Eythorne, Dover