Capacity
8.90 MW
Mapped total
Pembrokeshire · Pembrokeshire · Wales · Wales
Capacity
8.90 MW
Mapped total
Status
Inactive
Current state
Energy source
Solar
Mapped fuel group
Trecoed Farm is an inactive solar site in Pembrokeshire · Pembrokeshire · Wales · Wales with 8.90 MW of mapped capacity operated by Transition Bro Gwaun.