Power siteSolar asset

Urenco Uk Limited, Capenhurst Lane - Solar Panels

Cheshire West and Chester · Cheshire · North West · England

Mapped capacity
0.25 MW
Status
Pipeline
Energy source
Solar

Capacity

0.25 MW

Mapped total

Status

Pipeline

Current state

Energy source

Solar

Mapped fuel group

Power Source: Solar

Urenco Uk Limited, Capenhurst Lane - Solar Panels is an pipeline solar site in Cheshire West and Chester · Cheshire · North West · England with 0.25 MW of mapped capacity operated by URENCO UK Limited.

Postcode[object Object]
CountyCheshire
RegionNorth West
CountryEngland

Site facts

Status
Pipeline
Energy source
Solar
Mapped capacity
0.25 MW
Operator
URENCO UK Limited
Commissioned
2023
Address
Capenhurst Lane, Capenhurst, Chester