Capacity
35.0 MW
Mapped total
Huntingdonshire · Cambridgeshire · Eastern · England
Capacity
35.0 MW
Mapped total
Status
Pipeline
Current state
Energy source
Solar
Mapped fuel group
Vicarage Lane, Diddington - Solar Arrays is an pipeline solar site in Huntingdonshire · Cambridgeshire · Eastern · England with 35.0 MW of mapped capacity operated by Cell Energy Limited.