Capacity
34.8 MW
Mapped total
Wiltshire · Wiltshire · South West · England
Capacity
34.8 MW
Mapped total
Status
Operational
Current state
Energy source
Solar
Mapped fuel group
Water Eaton Farm / Port Farm is an operational solar site in Wiltshire · Wiltshire · South West · England with 34.8 MW of mapped capacity operated by Foresight/ Vogt solar.