Capacity
30.0 MW
Mapped total
Great Britain
Capacity
30.0 MW
Mapped total
Status
Pipeline
Current state
Energy source
Storage
Mapped fuel group
Mybster BESS_Ver2 is an pipeline storage site in Great Britain with 30.0 MW of mapped capacity operated by ANESCO LIMITED.
Location not published for this power site yet.