Toftinghall BESS 1

Great Britain

Mapped capacity
25.2 MW
Status
Pipeline
Energy source
Storage

Capacity

25.2 MW

Mapped total

Status

Pipeline

Current state

Energy source

Storage

Mapped fuel group

Power Source: Storage

Toftinghall BESS 1 is an pipeline storage site in Great Britain with 25.2 MW of mapped capacity operated by Toftingall Wind Limited.

Location

Location not published for this power site yet.

Site facts

Status
Pipeline
Energy source
Storage
Mapped capacity
25.2 MW
Operator
Toftingall Wind Limited
Commissioned
2030
Grid connection
SHET
Address
Mybster 2 132/33kV Substation