Capacity
58.0 MW
Mapped total
The Planning Inspectorate - National Infrastructure · Cambridgeshire · Eastern · England
Capacity
58.0 MW
Mapped total
Status
Pipeline
Current state
Energy source
Waste / EfW
Mapped fuel group
Medworth EfW is an pipeline waste / efw site in The Planning Inspectorate - National Infrastructure · Cambridgeshire · Eastern · England with 58.0 MW of mapped capacity operated by MVV Environment.