Capacity
95.0 MW
Mapped total
The Planning Inspectorate - National Infrastructure · Lincolnshire · Yorkshire and Humber · England
Capacity
95.0 MW
Mapped total
Status
Pipeline
Current state
Energy source
Waste / EfW
Mapped fuel group
North Lincolnshire Green Energy Park is an pipeline waste / efw site in The Planning Inspectorate - National Infrastructure · Lincolnshire · Yorkshire and Humber · England with 95.0 MW of mapped capacity operated by Solar 21 Renewable Energy Limited.