Power siteWind asset

Convatec Green Manufacturing Hub

Welsh Government (NSIP) · Gwent · Wales · Wales

Mapped capacity
15.0 MW
Status
Inactive
Energy source
Wind

Capacity

15.0 MW

Mapped total

Status

Inactive

Current state

Energy source

Wind

Mapped fuel group

Power Source: Wind

Convatec Green Manufacturing Hub is an inactive wind site in Welsh Government (NSIP) · Gwent · Wales · Wales with 15.0 MW of mapped capacity operated by Convatec Limited.

Postcode[object Object]
CountyGwent
RegionWales
CountryWales

Site facts

Status
Inactive
Energy source
Wind
Mapped capacity
15.0 MW
Operator
Convatec Limited
Address
Unit 1 - 2 Heads Of The Valleys Industrial Estate, Rhymney, Tredegar