Power siteWind asset

Dogger Bank C (was Teesside A)

The Planning Inspectorate - National Infrastructure · Offshore · Offshore · England

Mapped capacity
1.2 GW
Status
Construction
Energy source
Wind

Capacity

1.2 GW

Mapped total

Status

Construction

Current state

Energy source

Wind

Mapped fuel group

Power Source: Wind

Dogger Bank C (was Teesside A) is an construction wind site in The Planning Inspectorate - National Infrastructure · Offshore · Offshore · England with 1.2 GW of mapped capacity operated by SSE/Equinor (formerly Statoil, formerly Forewind).

CountyOffshore
RegionOffshore
CountryEngland

Site facts

Status
Construction
Energy source
Wind
Mapped capacity
1.2 GW
Operator
SSE/Equinor (formerly Statoil, formerly Forewind)
Commissioned
2022
Address
125km off coast of Yorkshire