Power siteWind asset

Lan At Hilton, Park Farm - Wind Turbine

Aberdeenshire · Aberdeenshire · Scotland · Scotland

Mapped capacity
2.40 MW
Status
Operational
Energy source
Wind

Capacity

2.40 MW

Mapped total

Status

Operational

Current state

Energy source

Wind

Mapped fuel group

Power Source: Wind

Lan At Hilton, Park Farm - Wind Turbine is an operational wind site in Aberdeenshire · Aberdeenshire · Scotland · Scotland with 2.40 MW of mapped capacity operated by Farm Energy Consulting.

Postcode[object Object]
CountyAberdeenshire
RegionScotland
CountryScotland

Site facts

Status
Operational
Energy source
Wind
Mapped capacity
2.40 MW
Operator
Farm Energy Consulting
Commissioned
2017
Address
Site at Cairnhill Banff