Capacity
1.50 MW
Mapped total
South Lanarkshire · Lanarkshire · Scotland · Scotland
Capacity
1.50 MW
Mapped total
Status
Inactive
Current state
Energy source
Wind
Mapped fuel group
Land associated with Rawhead Farm is an inactive wind site in South Lanarkshire · Lanarkshire · Scotland · Scotland with 1.50 MW of mapped capacity operated by Raahead WT Limited.