Power siteWind asset

Milton of Fisherie Wind Cluster

Aberdeenshire · Grampian · Scotland · Scotland

Mapped capacity
4.60 MW
Status
Operational
Energy source
Wind

Capacity

4.60 MW

Mapped total

Status

Operational

Current state

Energy source

Wind

Mapped fuel group

Power Source: Wind

Milton of Fisherie Wind Cluster is an operational wind site in Aberdeenshire · Grampian · Scotland · Scotland with 4.60 MW of mapped capacity operated by LocoGen.

Postcode[object Object]
CountyGrampian
RegionScotland
CountryScotland

Site facts

Status
Operational
Energy source
Wind
Mapped capacity
4.60 MW
Operator
LocoGen
Commissioned
2016
Address
King Edward, Banff AB45 3PX