Capacity
0.33 MW
Mapped total
Pembrokeshire · Dyfed · Wales · Wales
Capacity
0.33 MW
Mapped total
Status
Pipeline
Current state
Energy source
Wind
Mapped fuel group
Summerton Farm, Sageston - Wind Turbine is an pipeline wind site in Pembrokeshire · Dyfed · Wales · Wales with 0.33 MW of mapped capacity operated by Constantine Wind Energy Limited.