Capacity
0.45 MW
Mapped total
Aberdeenshire · Aberdeenshire · Scotland · Scotland
Capacity
0.45 MW
Mapped total
Status
Pipeline
Current state
Energy source
Wind
Mapped fuel group
Upper Mains Farm - Wind Turbine is an pipeline wind site in Aberdeenshire · Aberdeenshire · Scotland · Scotland with 0.45 MW of mapped capacity operated by CWE V27 Limited.