Capacity
6.80 MW
Mapped total
East of England · England
Capacity
6.80 MW
Mapped total
Status
Operational
Current state
Energy source
Wind
Mapped fuel group
Eye is an operational wind site in East of England · England with 6.80 MW of mapped capacity operated by Temporis Capital.