Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of Brentwood and Ongar, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

131 MW

Filtered total

Storage capacity

130 MW

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of Brentwood and Ongar is Battery at 130 MW (49.9% of capacity), compared with 35.2% nationally. Total mapped capacity within 10 miles is 260 MW, versus 314 GW nationally (0.1%).

Nearby power sites

Power sites near Brentwood and Ongar, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Crouch Solar Farm
Brentwood · Essex · Eastern · England
Solar
Operational
49.9 MW
Not published
Crouch Solar Farm
Brentwood · Essex · Eastern · England
Battery
Operational
49.9 MW
Not published
Ongar Landfill Scheme 2
Epping Forest · Essex · Eastern · England
Gas
Operational
1.80 MW
Not published
Brentwood nergy Storage System
Brentwood · Essex · Eastern · England
Battery
Pipeline
49.9 MW
Not published
Thrift Solar Farm and BESS
Epping Forest · Essex · Eastern · England
Battery
Pipeline
30.0 MW
Not published
Thrift Solar Farm and BESS
Epping Forest · Essex · Eastern · England
Solar
Pipeline
30.0 MW
Not published
Nickerlands Solar Farm - Solar Farm
Epping Forest · Essex · Eastern · England
Solar
Pipeline
25.0 MW
Not published
Billericay Solar Farm - Solar Farm
Brentwood · Essex · Eastern · England
Solar
Pipeline
15.0 MW
Not published
Ongar Landfill Ground mounted solar photovoltaic
Brentwood · Essex · Eastern · England
Solar
Pipeline
8.80 MW
Not published