Sales (12M)
896Constituency Ledger4,878 postcode units
Central Devon
Sir Mel Stride · Conservative
Median Price
£300,000Current MP
Sir Mel Stride (Conservative)Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of Central Devon, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
88.6 MW
Filtered total
Storage capacity
30.0 MW
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of Central Devon is Solar at 50.6 MW (42.7% of capacity), compared with 15.8% nationally. Total mapped capacity within 10 miles is 119 MW, versus 314 GW nationally (0.0%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.
Nearby power sites
Power sites near Central Devon, ordered by straight-line distance from the mapped centre.