Sales (12M)
952Constituency Ledger5,237 postcode units
High Peak
Jon Pearce · Labour
Median Price
£250,000Current MP
Jon Pearce (Labour)Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of High Peak, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
3.10 MW
Filtered total
Storage capacity
83.0 MW
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of High Peak is Battery at 83.0 MW (96.4% of capacity), compared with 35.2% nationally. Total mapped capacity within 10 miles is 86.1 MW, versus 314 GW nationally (0.0%).
Nearby power sites
Power sites near High Peak, ordered by straight-line distance from the mapped centre.