Constituency Ledger4,761 postcode units
Montgomeryshire and Glyndwr
Steve Witherden · Labour
Sales (12M)
735Median Price
£205,000Current MP
Steve Witherden (Labour)Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of Montgomeryshire and Glyndwr, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
559 MW
Filtered total
Storage capacity
450 MW
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of Montgomeryshire and Glyndwr is Wind at 545 MW (54.0% of capacity), compared with 25.5% nationally. Total mapped capacity within 10 miles is 1.0 GW, versus 314 GW nationally (0.3%). Wind capacity is a theoretical maximum; actual output depends on weather conditions.
Nearby power sites
Power sites near Montgomeryshire and Glyndwr, ordered by straight-line distance from the mapped centre.