Sales (12M)
996Constituency Ledger4,407 postcode units
North Dorset
Simon Hoare · Conservative
Median Price
£338,748Current MP
Simon Hoare (Conservative)Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of North Dorset, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
256 MW
Filtered total
Storage capacity
110 MW
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of North Dorset is Solar at 233 MW (63.8% of capacity), compared with 15.8% nationally. Total mapped capacity within 10 miles is 366 MW, versus 314 GW nationally (0.1%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.
Nearby power sites
Power sites near North Dorset, ordered by straight-line distance from the mapped centre.