Constituency Ledger3,695 postcode units

North West Cambridgeshire

Sam Carling · Labour

Sales (12M)
1,141
Median Price
£255,000
Current MP
Sam Carling (Labour)

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of North West Cambridgeshire, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

90.7 MW

Filtered total

Storage capacity

-

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of North West Cambridgeshire is Solar at 75.9 MW (83.7% of capacity), compared with 15.8% nationally. Total mapped capacity within 10 miles is 90.7 MW, versus 314 GW nationally (0.0%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.

Nearby power sites

Power sites near North West Cambridgeshire, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Ramsey 2 Wind Farm
East of England · England
Wind
Operational
8.00 MW
Not published
Land at Biggin Lane
Huntingdonshire · Cambridgeshire · Eastern · England
Solar
Operational
5.00 MW
Not published
Bury Green
East of England · England
Solar
Operational
4.97 MW
Not published
RamseySolar
East of England · England
Solar
Operational
4.97 MW
Not published
Little Staughton Solar Farm
Huntingdonshire · Cambridgeshire · Eastern · England
Solar
Pipeline
50.0 MW
Not published
Wittering Ford Road, Barnack - Solar Photovoltaic Farm
Peterborough · Cambridgeshire · Eastern · England
Solar
Pipeline
11.0 MW
Not published
The Drove, Pondersbridge - Anaerobic Digestion Plant
Huntingdonshire · Cambridgeshire · Eastern · England
Biomass
Pipeline
6.80 MW
Not published