Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of Redcar, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

337 MW

Filtered total

Storage capacity

244 MW

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of Redcar is Battery at 244 MW (42.0% of capacity), compared with 35.2% nationally. Total mapped capacity within 10 miles is 581 MW, versus 314 GW nationally (0.2%).

Nearby power sites

Power sites near Redcar, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Wilton 11
North East · England
Other
Operational
49.0 MW
Not published
Wilton 10 Biomass
North East · England
Biomass
Operational
33.3 MW
Not published
Imperial Park
Redcar and Cleveland · Cleveland · North East · England
Biomass
Operational
5.10 MW
Not published
ICI No2 (Teesport) Landfill
Redcar and Cleveland · Cleveland · North East · England
Gas
Operational
1.00 MW
Not published
Greystones Road, Grangetown - Battery Energy Storage System
Redcar and Cleveland · Cleveland · North East · England
Battery
Pipeline
244 MW
Not published
Wilton Industrial, Plot 1C - Electrolytic Hydrogen Facility
Redcar and Cleveland · Cleveland · North East · England
Other
Pipeline
105 MW
Not published
Elring Klinger, Troisdorf Way - Solar PV Panels
Redcar and Cleveland · Cleveland · North East · England
Solar
Pipeline
49.9 MW
Not published
Redcar Energy Centre
Redcar and Cleveland · Cleveland · North East · England
Waste / EfW
Pipeline
49.9 MW
Not published
Grangetown Prairie - Energy Recovery Facility, Option 1
Redcar and Cleveland · Cleveland · North East · England
Waste / EfW
Pipeline
35.5 MW
Not published
Wilton International, Teesside - Green Hydrogen Plant
Redcar and Cleveland · Cleveland · North East · England
Other
Pipeline
8.00 MW
Not published