Sales (12M)
1,189Constituency Ledger4,319 postcode units
Rossendale and Darwen
Andy MacNae · Labour
Median Price
£170,000Current MP
Andy MacNae (Labour)Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of Rossendale and Darwen, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
77.8 MW
Filtered total
Storage capacity
10.0 MW
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of Rossendale and Darwen is Wind at 75.2 MW (85.6% of capacity), compared with 25.5% nationally. Total mapped capacity within 10 miles is 87.8 MW, versus 314 GW nationally (0.0%). Wind capacity is a theoretical maximum; actual output depends on weather conditions.
Nearby power sites
Power sites near Rossendale and Darwen, ordered by straight-line distance from the mapped centre.