Sales (12M)
1,086Constituency Ledger6,231 postcode units
Thirsk and Malton
Kevin Hollinrake · Conservative
Median Price
£250,000Current MP
Kevin Hollinrake (Conservative)Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of Thirsk and Malton, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
90.3 MW
Filtered total
Storage capacity
118 MW
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of Thirsk and Malton is Battery at 118 MW (56.6% of capacity), compared with 35.2% nationally. Total mapped capacity within 10 miles is 208 MW, versus 314 GW nationally (0.1%).
Nearby power sites
Power sites near Thirsk and Malton, ordered by straight-line distance from the mapped centre.