Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of CH60, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

1.5 GW

Filtered total

Storage capacity

250 MW

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of CH60 is Gas at 1.4 GW (80.2% of capacity), compared with 30.1% nationally. Total mapped capacity within 10 miles is 1.8 GW, versus 105 GW nationally (1.7%).

Nearby power sites

Power sites near CH60, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Kingspan Factory Wind Turbines
Flintshire · Flintshire · Wales · Wales
Wind
Operational
5.00 MW
4.93 mi
Bromborough Dock Landfill Scheme
Wirral · Merseyside · North West · England
Gas
Operational
3.70 MW
5.00 mi
Bidston Moss Landfill Scheme
Wirral · Merseyside · North West · England
Gas
Operational
2.30 MW
5.81 mi
Parc Adfer EfW
Flintshire · Clwyd · Wales · Wales
Waste / EfW
Operational
16.0 MW
6.74 mi
National Grid Electricity Substation, Capenhurst Lane - Battery Storage
Cheshire West and Chester · Cheshire · North West · England
Battery
Operational
200 MW
7.04 mi
Shotwick
Wales · Wales
Solar
Operational
72.2 MW
7.53 mi
Cheshire
North West · England
Gas
Operational
40.0 MW
7.70 mi
Connahs Quay
Wales · Wales
Gas
Operational
1.4 GW
8.36 mi
Port of Liverpool - wind
Sefton · Merseyside · North West · England
Wind
Operational
10.0 MW
9.27 mi
Lister Battery Limited - Battery Energy Storage System
Liverpool · Merseyside · North West · England
Battery
Operational
49.9 MW
9.47 mi