Sales (24m)
1,014District Ledger1,242 postcode units
CM8
Braintree
Median Price (3Y)
£371,947Price Trend (5Y)
Not enough salesSales (24m)
1,014
Median Price (3Y)
£371,947
Price Trend (5Y)
Not enough sales
Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of CM8, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
254 MW
Filtered total
Storage capacity
-
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of CM8 is Solar at 247 MW (97.4% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 254 MW, versus 105 GW nationally (0.2%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.
Nearby power sites
Power sites near CM8, ordered by straight-line distance from the mapped centre.