Sales (24m)
1,176District Ledger1,650 postcode units
CO7
Tendring
Median Price (3Y)
£385,974Price Trend (5Y)
Not enough salesSales (24m)
1,176
Median Price (3Y)
£385,974
Price Trend (5Y)
Not enough sales
Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of CO7, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
222 MW
Filtered total
Storage capacity
-
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of CO7 is Solar at 205 MW (92.4% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 222 MW, versus 105 GW nationally (0.2%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.
Nearby power sites
Power sites near CO7, ordered by straight-line distance from the mapped centre.