District Ledger1,016 postcode units

CT2

Canterbury

Sales (24m)
611
Median Price (3Y)
£549,087
Price Trend (5Y)
Not enough sales

Sales (24m)

611

Median Price (3Y)

£549,087

Price Trend (5Y)

Not enough sales

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of CT2, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

512 MW

Filtered total

Storage capacity

150 MW

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of CT2 is Solar at 502 MW (75.9% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 662 MW, versus 105 GW nationally (0.6%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.

Nearby power sites

Power sites near CT2, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Shelford Landfill Scheme
Canterbury · Kent · South East · England
Gas
Operational
1.90 MW
0.85 mi
Shelford Generation Plant II
Canterbury · Kent · South East · England
Gas
Operational
8.00 MW
0.90 mi
Woodlands Farm
South East · England
Solar
Operational
13.2 MW
2.81 mi
Littlebourne
Canterbury · Kent · South East · England
Solar
Operational
17.0 MW
2.96 mi
Owls Hatch
South East · England
Solar
Operational
51.9 MW
4.14 mi
Swalecliffe Community Primary School, Bridgefield Road - Solar Panels
Canterbury · Kent · South East · England
Solar
Operational
18.0 MW
4.43 mi
Abbey Fields Solar Farm
South East · England
Solar
Operational
4.94 MW
7.82 mi
Cleve Hill Solar Project
The Planning Inspectorate - National Infrastructure · Kent · South East · England
Solar
Operational
373 MW
7.95 mi
Cleve Hill Solar Project
The Planning Inspectorate - National Infrastructure · Kent · South East · England
Battery
Operational
150 MW
7.95 mi
Knowlton
South East · England
Solar
Operational
11.5 MW
8.84 mi
Marshborough Farm solar park
Dover · Kent · South East · England
Solar
Operational
12.8 MW
9.73 mi