Sales (24m)
0District Ledger12 postcode units
CT50
Folkestone and Hythe
Median Price (3Y)
Not availablePrice Trend (5Y)
Not enough salesSales (24m)
0
Median Price (3Y)
Not available
Price Trend (5Y)
Not enough sales
Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of CT50, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
26.8 MW
Filtered total
Storage capacity
-
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of CT50 is Solar at 26.8 MW (100.0% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 26.8 MW, versus 105 GW nationally (0.0%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.
Nearby power sites
Power sites near CT50, ordered by straight-line distance from the mapped centre.