District Ledger21 postcode units

LE94

Harborough

Sales (24m)
0
Median Price (3Y)
Not available
Price Trend (5Y)
Not enough sales

Sales (24m)

0

Median Price (3Y)

Not available

Price Trend (5Y)

Not enough sales

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of LE94, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

76.4 MW

Filtered total

Storage capacity

-

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of LE94 is Wind at 39.1 MW (51.3% of capacity), compared with 35.8% nationally. Total mapped capacity within 10 miles is 76.4 MW, versus 105 GW nationally (0.1%). Wind capacity is a theoretical maximum; actual output depends on weather conditions.

Nearby power sites

Power sites near LE94, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Meadow Farm (Thorpe Lanton)
East Midlands · England
Solar
Operational
5.00 MW
2.00 mi
Land at Meadow Farm
Harborough · Leicestershire · East Midlands · England
Solar
Operational
5.00 MW
2.40 mi
Eckland Lodge
East Midlands · England
Solar
Operational
3.66 MW
3.20 mi
Gaultney
East Midlands · England
Solar
Operational
21.6 MW
4.84 mi
Kelmarsh Wind Farm (Resubmission)
West Northamptonshire · Northamptonshire · East Midlands · England
Wind
Operational
12.5 MW
6.04 mi
Kelmarsh
East Midlands · England
Wind
Operational
12.3 MW
6.21 mi
New Albion
East Midlands · England
Wind
Operational
14.3 MW
6.27 mi
Portley Ford Landfill Site
West Northamptonshire · Northamptonshire · East Midlands · England
Gas
Operational
2.00 MW
8.08 mi