Sales (24m)
0District Ledger29 postcode units
S49
Chesterfield
Median Price (3Y)
Not availablePrice Trend (5Y)
Not enough salesSales (24m)
0
Median Price (3Y)
Not available
Price Trend (5Y)
Not enough sales
Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of S49, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
99.1 MW
Filtered total
Storage capacity
25.0 MW
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of S49 is Solar at 79.0 MW (63.6% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 124 MW, versus 105 GW nationally (0.1%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.
Nearby power sites
Power sites near S49, ordered by straight-line distance from the mapped centre.